Project Search Results

Site Environment Management and Safety Services
Read More
Senior Planning Advice and Technical Review – SIMTA Moorebank Logistics Park
Senior planning advisory and technical review role for the Moorebank Logistics Park precinct.
Read More
School Infrastructure NSW
Read More
Lindfield Learning Village
Preparation of the compliance monitoring program (including schedule, methodology and evidence expectations) in respect of construction and operation conditions of consent for Lindfield Learning Village, a State significant development, under the DP&E Compliance Monitoring and Reporting Post Approval Requirements (DP&E June 2018). Note this was not the preparation of the compliance report. Preparation of the […]
Read More
Planning Pathway Advice and Preparation of Review of Environmental Factors
Read More
Preparation of Review of Environmental Factors – Timberwell Drive, Haberfield
Read More
Provision of Planning Pathway Advice and Preparation of Review of Environmental Factors – Erina
Read More
Preparation of Review of Environmental Factors – Spit Bridge, Mosman
Read More
Preparation of Review of Environmental Factors, Jamison Park, Penrith
Read More
Project Management of Encapsulating lead-containing materials
Google instructed Aspect to engage specialist contractors, consultants and NATA-accredited laboratories to isolate (encapsulate) lead-containing paint and safely remove lead-containing dust in identified areas. Key Aspects: Following Aspect’s completion of the Hazardous Materials Register and Management Plan of Google’s site in Pyrmont, Google instructed Aspect to engage the relevant contractor and specialist consultants to safely […]
Read More
Project Management of HazMat Survey
Google instructed Aspect to engage specialist consultants and NATA-accredited laboratories to update the hazardous materials register and management plan for the site.   Key Aspects: Following Aspect’s completion of the Environmental Due Diligence of Google’s site in Pyrmont, Google instructed Aspect to engage the relevant specialist consultants to conduct a hazardous materials survey and update […]
Read More
Environmental Due Diligence: REVY
Environmental due diligence of the target acquisition site (REVY) in Pyrmont, Sydney on behalf of Google. Key Aspects: In response to Google’s requirement, the EDD was carefully expedited and accurately identified the environmental and H&S risks inherent to the site.  This enabled Google to manage their risk by taking appropriate immediate corrective action at the […]
Read More
Environmental Due Diligence: Arrow Marine
Environmental due diligence of an additional target acquisition site in Pyrmont, Sydney on behalf of Google. Key Aspects Following the previous EDD Google requested Aspect to perform a second EDD carefully and accurately to identify the environmental and H&S risks inherent to the site.  
Read More
EMS Gap Analysis and Continuous Improvement Workshops – Cairns International Airport
Cairns International Airport were in the process of revising and developing their Environmental Management System (EMS) in order to meet the requirements of the revised ISO 14001:2015 standard. Aspect collaborated with the Cairns Airport Environmental Manager and facilitated an onsite 2-day gap analysis of the EMS against the requirements of the new standard: Context of […]
Read More
Blair Athol Mine – Independent Environmental Audit
Preparation of an independent 3rd party audit of the compliance of the Blair Athol Mine’s environmental performance against the issued Environmental Regulated Activity permit for the mine. Email: Richard Johnson (richard@aspectenvironmental.com.au) Phone: 0409 051 535 Key Aspects The audit was undertaken by Richard Johnson as the Lead Auditor and involved: review of above ground works, […]
Read More
HSEQ Management System
Read More
Adelaide Expansion Project Independent WHS Auditor
SKYCITY Entertainment Group appointed Aspect as the independent WHS auditor for the construction of the new hotel being built as part of the Adelaide Expansion Project at the Adelaide Casino in South Australia. Key Aspects Performed independent WHS audits of the principal contractor on a quarterly basis, in accordance with the client’s Auditing procedure. Reported […]
Read More
NZICC and Horizon Hotel Independent H&S Auditor
SKYCITY Entertainment Group appointed Aspect as the independent WHS auditor for the construction of the NZICC and Horizon Hotel in Auckland, New Zealand, for a pre-determined 18-month duration. Key Aspects Quarterly WHS audits of the principal contractor against their WHJS management plan and critical risks Auditors accredited by Exemplar Global NZICC and Hobson Street Hotel […]
Read More
WHS Manager Secondment
AVID Property Group engaged Aspect to assist them in managing key WHS risks during the design, construction and operation phases of their developments. Aspect also provided ongoing support to enable AVID’s WHS management system to be improved and embedded. Key Aspects Implementation of WHS software-as-a-service platform into business Improvement of the WHS management system Training […]
Read More
EIA – Jurong Island Underground Hydrocarbon Storage Caverns
Senior technical environmental review of the Pollution Control Study (EIS equivalent) submitted to the Singapore Government for the development of the first commercial underground rock caverns facility for storage of liquid hydrocarbons in Southeast Asia.
Read More
EIA – Burwood Beach Wastewater Treatment Works
Staged upgrade of a wastewater treatment facility located south of Newcastle with a discharge outfall into the ocean. Project Director for the EIA component.
Read More
REF Program
Complete REFs for 15 potential drill sites located within Petroleum Exploration Licences. Assess the environmental impacts associated with the exploratory drilling at each location in accordance with Part 5 of the EP&A Act 1979. Key Aspects Program of 15 EIA’s for petroleum exploration
Read More
Substation Augmentation Project – Tomago 330kV AEMAR
Environmental Representative for the Tomago 330kV Substation augmentation project.
Read More
Development Consent Compliance Audit – Chullora Bakery
Development Consent compliance audit of George Weston Foods Chullora Bakery and subsequent Annual Environmental Management Reports (AEMR) and site management procedures.
Read More
EIA – Branxton Wastewater Treatment Works
Project Director for the EIA component of the concept design and approvals project.
Read More
SISP Part 3A Assessment
SISP Part 3A Assessment.
Read More
PCB Management and Licensing
Management and coordination of TransGrid’s obligations under the Environmentally Hazardous Chemicals Act 1985 and the PCB Chemical Control Order.
Read More
Environmental Management & Rehabilitation – White Bay Power Station Site
Coordination of site assessment activities to quantify site health, safety and environmental risk. Preparation of Preliminary Remediation Action Plan. Advise on contractual engagements and technical specifications.
Read More
Technical and Environmental Planning Advice
Technical and planning advice on industrial developments on airport lands.
Read More
Airport Planning Analysis – Archerfield
Preparation of a planning approvals process review for potential development on lands adjacent to Archerfield Airport in Queensland.
Read More
Mine Closure Plan – Comet Vale
Preparation of a mine closure plan for a Hillgrove Resources site in northern NSW. The document detailed the site background, closure and lease relinquishment procedures, management strategies to enhance site stability and reduce generation of acid mine drainage. The closure plan adopted a risk based approach to complement the assessment and verification of achieved closure criteria and recommended a monitoring program to enable performance to be progressively assessed.
Read More
Design Alliance Part 3A Assessment
Environmental lead for the preparation of an assessment under Part 3A of the Environmental Planning and Assessment Act 1979.
Read More
Local Environmental Study – Teralba
Preparation of a local environmental study for redevelopment of land near Teralba, NSW on behalf of Lake Macquarie City Council.
Read More
Remediation Project – Hunter River
Project director and approvals coordinator for the initial stages of the remediation project being undertaken on the Southern Arm of the Hunter River in the Port of Newcastle.
Read More
Environmental Planning Advice
Provided planning and assessment advice in relation to planning pathways for State and Commonwealth legislation pertaining to freight rail development proposals.
Read More
Western Sydney Replacement Flows Project
Design, build and operation of a 50 ML/d advanced water treatment plant at the St Marys STP for the treatment of tertiary treated effluent from Quakers Hill, Penrith and St Marys STPs, associated pipelines and pump stations.
Read More
Tamworth Sewerage Augmentation Program (Part A)
Alliance for the D&C works associated with the Tamworth Sewerage Augmentation Program and included the upgrade of Westdale WWTP to 61,000 EP, effluent pumping station, 7.5km rising main and 2,000ML storage at the effluent re-use farm.
Read More
Sewer Rehabilitation Program and Watermains Renewal Project
The Sewer Rehabilitation Program repaired and rehabilitated sewer pipes. The Watermain Renewals Project improved the water supply system by fixing and renewing water assets such as old or damaged water pipes, valves, hydrants and private water service pipes.
Read More
Advanced Water Treatment Plant – Luggage Point
Alliance to construct the Luggage Point Advanced Water Treatment Plant (up to 70 ML/day of treated recycled water). Secondary treated effluent, previously discharged to the Brisbane River is now transferred for further treatment. Advanced treatment and purification is achieved via chemical dosing, microfiltration, RO and UV disinfection.
Read More
IMS Development and Certification – Construction
fgf Developments were establishing their environmental, safety and quality management systems in preparation for third party certification (SAI Global) – triple certification. Mathew was engaged to provide technical support and expert advice. He was accountable for: Development of their Environmental Management System (EMS) to the ISO 14001 standard. Integration of the EMS with safety and […]
Read More
IMS Development and Certification – Professional Services firm
In 2013 Richard was tasked with managing WSP Environmental’s ISO 9001, 14001 and AS/NZS 4801 integrated management system. Certification was retained every year, and included both surveillance and certification audits. In 2015 Richard was tasked to be part of the integration between WSP and Parsons Brinckerhoff management systems. Highlights of the process included: Certification of […]
Read More
HSE Assurance Auditing Program
A forward-thinking client wanted contractor management plans and SWMS reviewed prior to their engagement. The plans and SWMS were then audited by our team during construction work to provide assurance to the client during the construction phase.
Read More
HSE Assurance Auditing Program
Devising an audit programme and delivering hundreds of audits over a three year audit assurance program was the outcome of this project. The client used the audit data to inform their HSE strategy.
Read More
Safety Leadership Training – Government
Training staff in risk awareness was the ultimate objective of this training package that was tailored to meet client expectations.
Read More
Safety Leadership Training
Hundreds of existing and future leaders were exposed to safety, health and environmental training in leadership, demonstrating safety as a value, and the introduction of People-based safety ©
Read More
Project Risk Assessment – Outer Suburban Arterial Roads (OSAR)
A pre-project risk management workshop was conducted identifying high level issues, hazards and impacts to the project prior to commencement. Residual risk action plans were generated.
Read More
Plant Risk Assessment
60 items of plant and machinery were systematically risk assessed, mitigation strategies identified. It was all documented using the client’s own template and risk matrix.
Read More

View more of our project portfolio