Prepare a Review of Environmental Factors (REF) for the Isolated Gas Main Removal Project at The Spit Bridge, Spit Road, Mosman NSW.
Email: Megan Kovelis (megan@aspectenvironmental.com.au)
Phone: 0403 963 967
Key Aspects
- Site inspection to ascertain key environmental considerations and context.
- Preparation of an REF document, documenting permissibility and application of relevant environmental legislation (including Heritage Act 1977 requirements), environmental impact assessment, identification of mitigation measures, rehabilitation and ongoing maintenance requirements.
- Key aspect of this project was considerations of the heritage value of the Spit Bridge.
- Additionally this project was in a coastal location with associated sensitivities, as well as being located along a popular pedestrian walkway.