Project Search Results

Site Environment Management and Safety Services
Read More
Project Management of HazMat Survey
Google instructed Aspect to engage specialist consultants and NATA-accredited laboratories to update the hazardous materials register and management plan for the site.   Key Aspects: Following Aspect’s completion of the Environmental Due Diligence of Google’s site in Pyrmont, Google instructed Aspect to engage the relevant specialist consultants to conduct a hazardous materials survey and update […]
Read More
EIA – Burwood Beach Wastewater Treatment Works
Staged upgrade of a wastewater treatment facility located south of Newcastle with a discharge outfall into the ocean. Project Director for the EIA component.
Read More
Technical and Environmental Planning Advice
Technical and planning advice on industrial developments on airport lands.
Read More
Airport Planning Analysis – Archerfield
Preparation of a planning approvals process review for potential development on lands adjacent to Archerfield Airport in Queensland.
Read More
Mine Closure Plan – Comet Vale
Preparation of a mine closure plan for a Hillgrove Resources site in northern NSW. The document detailed the site background, closure and lease relinquishment procedures, management strategies to enhance site stability and reduce generation of acid mine drainage. The closure plan adopted a risk based approach to complement the assessment and verification of achieved closure criteria and recommended a monitoring program to enable performance to be progressively assessed.
Read More
Remediation Project – Hunter River
Project director and approvals coordinator for the initial stages of the remediation project being undertaken on the Southern Arm of the Hunter River in the Port of Newcastle.
Read More
Western Sydney Replacement Flows Project
Design, build and operation of a 50 ML/d advanced water treatment plant at the St Marys STP for the treatment of tertiary treated effluent from Quakers Hill, Penrith and St Marys STPs, associated pipelines and pump stations.
Read More
Sewer Rehabilitation Program and Watermains Renewal Project
The Sewer Rehabilitation Program repaired and rehabilitated sewer pipes. The Watermain Renewals Project improved the water supply system by fixing and renewing water assets such as old or damaged water pipes, valves, hydrants and private water service pipes.
Read More
Advanced Water Treatment Plant – Luggage Point
Alliance to construct the Luggage Point Advanced Water Treatment Plant (up to 70 ML/day of treated recycled water). Secondary treated effluent, previously discharged to the Brisbane River is now transferred for further treatment. Advanced treatment and purification is achieved via chemical dosing, microfiltration, RO and UV disinfection.
Read More
Project Risk Assessment – Outer Suburban Arterial Roads (OSAR)
A pre-project risk management workshop was conducted identifying high level issues, hazards and impacts to the project prior to commencement. Residual risk action plans were generated.
Read More
Plant Risk Assessment
60 items of plant and machinery were systematically risk assessed, mitigation strategies identified. It was all documented using the client’s own template and risk matrix.
Read More

View more of our project portfolio